|
| Software Localization and Globalization >> Project Management |
1) Clear responsibility for each position: Strict definition of the duty scope for each position to ensure everyone assume their responsibility in an order way.

2) Project process optimization: Ensure project execution in an effective and order way.

3) Comprehensive KBM: Maximized absorbing rich experience and knowledge from previous projects. KBM is under a high access security level to protect the confidentiality of the knowledge base.
- Glossary DB: Ensuring the context consistency of an identical product, ensuring the version consistency
in different versions of an identical product, and making sure that the localization of new version is an optimized process, maximum reducing the cost for client.
- SPR DB: Ensuring each bug could be recorded, traced and fixed to guarantee the product quality at
maximum.
|
|